A collection of components that work together to realize some objective forms a system. Basically there are three major components in every system, namely input, processing and output.
System Life cycle
System life cycle is an organisational process of developing and maintaining systems. It helps in establishing a system project plan, because it gives overall list of processes and sub-processes required developing a system.
System development life cycle means combination of various activities. In other words we can say that various activities put together are referred as system development life cycle. In the System Analysis and Design terminology, the system development life cycle means software development life cycle.
Different phases of Software development Life Cycle
(a) System Study
System study is the first stage of system development life cycle. This gives a clear picture of what actually the physical system is? In practice, the system study is done in two phases. In the first phase, the preliminary survey of the system is done which helps in identifying the scope of the system. The second phase of the system study is more detailed and in-depth study in which the identification of user’s requirement and the limitations and problems of the present system are studied. After completing the system study, a system proposal is prepared by the System Analyst (who studies the system) and placed before the user. The proposed system contains the findings of the present system and recommendations to overcome the limitations and problems of the present system in the light of the user’s requirements.
(b) Feasibility Study
On the basis of result of the initial study, feasibility study takes place. The feasibility study is basically the test of the proposed system in the light of its workability, meeting user’s requirements, effective use of resources and .of course, the cost effectiveness. The main goal of feasibility study is not to solve the problem but to achieve the scope. In the process of feasibility study, the cost and benefits are estimated with greater accuracy.(c)
(c)System Analysis
Assuming that a new system is to be developed, the next phase is system analysis. Analysis involved a detailed study of the current system, leading to specifications of a new system. Analysis is a detailed study of various operations performed by a system and their relationships within and outside the system. During analysis, data are collected on the available files, decision points and transactions handled by the present system. Interviews, on-site observation and questionnaire are the tools used for system analysis.
(d) System Design
Based on the user requirements and the detailed analysis of a new system, the new system must be designed. This is the phase of system designing. It is a most crucial phase in the development of a system.
(e) Coding
After designing the new system, the whole system is required to be converted into computer understanding language. Coding the new system into computer programming language does this. It is an important stage where the defined procedure are transformed into control specifications by the help of a computer language. This is also called the programming phase in which the programmer converts the program specifications into computer instructions, which we refer as programs. The programs coordinate the data movements and control the entire process in a system.
It is generally felt that the programs must be modular in nature. This helps in fast development, maintenance and future change, if required.
(f) Testing
Before actually implementing the new system into operations, a test run of the system is done removing all the bugs, if any. It is an important phase of a successful system. After codifying the whole programs of the system, a test plan should be developed and run on a given set of test data. The output of the test run should match the expected results.
(g) Implementation
After having the user acceptance of the new system developed, the implementation phase begins. Implementation is the stage of a project during which theory is turned into practice. During this phase, all the programs of the system are loaded onto the user's computer. After loading the system, training of the users starts.
(h) Maintenance
Maintenance is necessary to eliminate errors in the system during its working life and to tune the system to any variations in its working environment. It has been seen that there are always some errors found in the system that must be noted and corrected. It also means the review of the system from time to time.